Green Building:
Essex County Greenbelt
INNOVATION AND DESIGN |
![]() |
|---|---|
Deciding early on to build “green” was key to cost management and a smooth building process. Close communication with the design/builder throughout the project made for a cohesive vision and an end result that exceeded expectations. |
|
The site design conserved significant resources by utilizing the original building and maximizing natural light, natural ventilation, passive solar heating and protection from wind. |
|
The building contains public educational displays including signage explaining green building applications throughout the building. Additionally, there will be a regular program of educational building tours, both on-site and online through a virtual tour.” |
|
A pavement-free driveway and parking lot reduce heat generation in summer months and prevents excess stormwater runoff. |